Cravencroft Limited Previous Projects



Recently Completed:

Albion Place, Maidstone

Client: Devafield Ltd
Project Duration: 42 weeks
Contract Value: £810k

The project consisted of the construction of a new block of 8nr apartments, 6nr 2 bed units and 2nr 1 bed units.

For more details click here.

 





Recently Completed

Trust Ford Mayesbrook
Client:
Ford
Project Duration: 12 weeks
Contract Value: £550k
Works due to commence: Mar ' 19

Demolition of forecourt and existing buildings, construction of a new used car sales building and forecourt facility.

   

Recently Completed

Fackenden Lane, Sevenoaks
Contract Type:
JCT Intermediate
Project Duration: 40 weeks
Contract Value: £940k
Date: Sept 15 - June 16

The works consisted the excavation and formation of a watertight basement using Sika waterproof concrete and a Grace membrane system to the external face of the concrete walls, Brickwork construction upto 1st floor level with a green oak frame for the 1st floor and roof construction. Internally Cravencroft installed an AV system throughout the property including a state of the art cinema room, mechanical and electrical services throughout as well as all finishes throughout the property, all windows, doors and staircase were all bespoke items and the kitchen was handmade. Floor finishes were a mixture of engineered out and limestone tiles, externally the infill panels were finished in a lime render with a wood float finish.

 

 


Recently Completed:

Tradebe, Strood
Client: Tradebe Healthcare
Project Duration: 10 weeks
Contract Value: £160K

works consist of a steel framed extension to an existing industrial unit with steel cladding and site wide drainage alterations for Tradebe Healthcare.

   

Recently Completed

Timothy Hatton Architects, Shepard’s Bush  

Client: Timothy Hatton Architects
Project Duration: 16 weeks
Contract Value: £220k

Cravencroft have commenced work on the conversion of an existing foundry building into a purpose built architects practice for Timothy Hatton Architects. The project involves underpinning to the existing structure and creating a new watertight basement structure and 1st floor mezzanine structure and construction of an external courtyard.

   