Recently Completed

Carshalton Boys Sports College

Project Duration: 24 weeks
Contract Value: £485k

Works were carried out between March to September 2019, works consisted of the construction of a new 3 class standalone maths block to the rear of the school and the introduction of a mezzanine structure through the school hall during the summer shut down period to form a new library area. The build consisted of 12m deep piled foundations with ground beams, substructure brickwork and a 225mm beam and block floor system. The superstructure was constructed from conventional masonry work with a timber / steel flat roof structure, single ply warm roof system and concrete coping stones to the parapets. Heating and cooling is provided by ceiling mounted cassette system, all wall and ceiling finishes received a plastered finish.

 



Recently Completed

Marshall – Mercedes Truck & Van Centre
Client: Marshall Motor Group
Project Duration: 26 weeks
Contract Value: £2,637.000

The work consisted of the refurbishment and extension of a derelict heavy good workshop, construction of a standalone steel framed used van sales building with associated drainage and HGV hardstanding areas for Marshall Motor Group in Southampton. The total project duration was 24 weeks, foundations were formed from large pads mass filled with concrete, the steel portal frame was then erected to provide an 8 bay truck workshop facility, together with a new parts store and workshop admin area. To the existing building all existing finishes and services were stripped out and replaced, a number of walls removed to provide a new aftersales reception area together with welfare and office facilities, the existing workshop refurbished for light commercial vehicle service and repair.

   
 

 


Recently Completed:

TrustFord, Bristol
Client: Ford
Project Duration: 24 weeks
Contract Value: £1.9 million

A very exciting contract – Cravencroft Ltd were appointed by Trust Ford as contractors for transforming and extending their car showroom facilities at Filton, Bristol. 

The works consisted of stripping and extending the existing new car sales building to give additional space for Ford’s expanding range of vehicles together with a new standalone building for the used car sales team.

Externally there are now new hard landscaped areas provided to give the used car sales team additional space for their used car stock.